EasyManuals Logo

Skyjack SJ12 User Manual

Skyjack SJ12
84 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #37 background imageLoading...
Page #37 background image
37
SJ12, SJ16 213721AAA
Visual and daily maintenance inspections Section 4 – Inspections Before Operation
14
4.2-8 Lift mechanism
11
Mast assembly
Make sure the mast assembly shows no signs
of visible damage, deformation, or cracks in
the weldments.
1. Complete the Function Tests in Section 4.3.
before proceeding to the next step.
2. Raise the platform.
12
Wear pads
Make sure the bolts are tight.
Make sure there are no loose or missing parts.
Make sure there is no visible damage.
13
Chains
Make sure the chains are correctly attached.
Make sure the bolts are tight.
Make sure there are no loose or missing parts.
Make sure there is no visible damage.
4.2-9 Optional equipment and
attachments
14
Flashing lights
Make sure there are no loose or missing parts.
Make sure there is no visible damage.
11
12
13

Table of Contents

Other manuals for Skyjack SJ12

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Skyjack SJ12 and is the answer not in the manual?

Skyjack SJ12 Specifications

General IconGeneral
Gradeability25%
Drive Motor24V DC
Machine Width32 in (0.81 m)
Stowed Height6.5 ft
Overall Width32 in (0.81 m)
Stowed Height (Rails Folded)6.5 ft
Drive Speed (Elevated)0.5 mph (0.8 km/h)
Power SourceElectric

Related product manuals