EasyManuals Logo

Skyjack SJ12 User Manual

Skyjack SJ12
84 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #21 background imageLoading...
Page #21 background image
21
SJ12, SJ16 213721AAA
FAMILIARIZATION
Section 3 – Familiarization
WARNING
Do not operate this MEWP without correct training
and authorization. If you do not obey, there is a
risk of death or serious injury.
WARNING
MEWP Familiarization must be given to a qualied
operator. If you do not obey, there is a risk of death
or serious injury.
WARNING
It is the responsibility of the operator to fully
understand, and follow all instructions and
warnings contained in this operation manual and
on the MEWP. If you do not obey, there is a risk of
death or serious injury.
Read and fully understand the operation manual,
all the warnings, and the instruction labels (refer to
Section 8) on the MEWP.
Do these tasks before the operation:
1. Worksite inspection. Refer to Section 2.4.
2. Daily visual and maintenance inspections. Refer
to Section 4.2.
3. Function tests. Refer to Section 4.3.

Table of Contents

Other manuals for Skyjack SJ12

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Skyjack SJ12 and is the answer not in the manual?

Skyjack SJ12 Specifications

General IconGeneral
Gradeability25%
Drive Motor24V DC
Machine Width32 in (0.81 m)
Stowed Height6.5 ft
Overall Width32 in (0.81 m)
Stowed Height (Rails Folded)6.5 ft
Drive Speed (Elevated)0.5 mph (0.8 km/h)
Power SourceElectric

Related product manuals