EasyManua.ls Logo

Sleipner SE60 - Page 12

Sleipner SE60
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
12
5693
21 2023
-
SE60/185 s2
MG_0005
R
D
1 2
3
4
6
5
8 x layers of fiberglass
and resin
8 x layers of fiberglass
and resin
MG_0006
R = D x 0,1
R = D x 0,1
D
x
0
,
1
-
0
,
1
5
D
x
0
,
1
-
0
,
1
5
D
Layers of
fiberglass
and resin
Layers of
fiberglass
and resin
*Fiberglass
Hull
*Steel/
Aluminium
Hull
Hull
Hull
Hull
Tunnel
Tunnel
Tunnel
Welding
Layers of
fiberglass
and resin
Additional Layers of
fiberglass and resin
Additional Layers of
fiberglass and resin
Hull
1 3
4
2
IMPORTANT
Avoid all casting where the motor-bracket is to be placed, as this will cause mis t and possible failure to the gear house.
Tunnel Installation
With tunnel installed and cast.
1. Round the edges with a radius of 10% of the tunnel diameter.
2. For steel/ aluminium hulls make a slope with a length of 10-15% of the tunnel diameter.
(NB: If this is not possible, round the tunnel end as much as possible.)
3. Additionally cast two layers on the outside of the tunnel/ hull in a 10cm area
4. Follow the same method if making the deflector/ spoiler.
You must apply gel coat to areas you have grounded/ moulded to make waterproof. These areas allow water access to the hull which is typically not
waterproof without these applications outside. (NB: All original Sleipner tunnels are fully waterproof when delivered except in the areas where
you have cut and bonded it to the hull.)
MC_0003

Related product manuals