EasyManua.ls Logo

Sleipner SE60 - Control Panel Installation Guide

Sleipner SE60
28 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
25
5693
21 2023
-
SE60/185 s2
MG_0578
Automatic Main Switch Wiring Diagram 24V Thruster
++
12V
BATTERY
++
12V
BATTERY
Fuse 5A
Thruster
4-wire cable
5-wire cable
4-wire cable
Thruster
Fuse
10A
Automatic Main Switch
Fuse 5A
5-wire cable
Automatic Main Switch
ANL Fuse
ANL Fuse
++
12V
BATTERY
++
12V
BATTERY
The Top wiring diagram is for a single bow or stern thruster system
The top and bottom wiring diagram is for a dual thruster system, for example a bow and stern installation.
Control
panel
Refer to the User and Installation
Manual of the control panel for
detailed installation instructions.
Control Panel Installation
For Control Panel installation please refer to the Installation Guide accompanying the control panel to be installed.
MC_0398
Control Panel
SLEIPNER MOTOR AS
P.O. Box 519
N-1612 Fredrikstad
Norway
www.sleipnergroup.com
DOCUMENT ID:
REVISION:
DATE:
LANGUAGE:
Installation Guide

Related product manuals