8.4 Commissioning the battery modules
Requirements:
☐ The battery modules must be correctly mounted.
☐ All cables must be correctly connected.
Procedure:
1. Open the cover of the DC switch on each battery module. The side cover must not be mounted for this.
2. Turn on the DC switches one after the other.
☑ The green LED is glowing or flashing.
☑ The blue LED is flashing first and starts glowing once a connection has been successfully established.
3. Close the cover of the DC switch on each battery module.
4. Attach the side covers.
5. Commission the inverter.
Also see:
• LED signals of the battery modules⇒page19