EasyManua.ls Logo

SMA PPM-10 - Page 48

SMA PPM-10
70 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6 Electrical Connection
SMA Solar Technology AG
Installation ManualPPM-10-IA-en-1648
Insulated conductor
pair
Insulated conductor
color
Contact-568A Contact-568B
2 white/orange 3 1
orange 6 2
3 white/green 1 3
green 2 6
4 white/brown 7 7
brown 8 8
Shorten protruding conductors.
Insert the cable organizer in the enclosure. Ensure that the
white arrow of the cable organizer is pointing towards the
white arrow on the enclosure.
The cable organizer snaps into place.
Push the folding parts of the enclosure back together using a suitable pair of pliers (e.g., pipe wrench).
The folding parts of the enclosure snap into place.
Secure the cable retainer of the enclosure with a cable tie.
Cut off the protruding end of the cable tie.
3. Push the RJ45 Keystone jacks into the cutouts of the module until they lock into place.
4. Secure the network cables to the metal bracket with the Velcro strip provided.
Mounting the modules of the patch panel
1. Insert the module with the installed cables in the enclosure of the patch panel.

Table of Contents

Related product manuals