6 Mounting
SMA Solar Technology AG
Installation ManualSCCPXT-SCS_NR-IA-en-1218
6.5 Mounting the New Rear Panel
Requirements:
☐ Two persons must be available for disassembling the rear panel.
☐ The required mounting material must be available (see Section5.1, page13).
☐ The inverter must be sufficiently protected from inclement weather.
CAUTION
Danger of crushing caused by heavy, bulky rear panel
The rear panel of the inverter is heavy and bulky. Danger of crushing when the rear panel slips off or tilts Weight of
the roof: 20kg.
• Wear suitable personal protective equipment for all work on the product.
• Always have two persons disassemble and mount the rear panel.
Procedure:
1. Position the new rear panel in front of the inverter opening and
secure it to prevent it from tipping over.
2. Apply metal-free all-purpose paste to the rear-panel bolt for mounting the grounding cable.
3. Fasten the grounding cable to the rear-panel bolt using a torque
wrench (AF 13, torque: 6Nm).
4. Ensure that the grounding cable is correctly mounted.
5. Apply metal-free all-purpose paste to all threads and set screws.
6. Align the rear panel on the inverter and hook it into the hook fitting.