T4 (053B) Series Installation Guide
CD354/220116 Smartscan Ltd
Figure L – Operation Cycle
Before installation read and
understand the Installation
Sheet provided paying
particular attention to the
information provided in Fig.
D
Refer to Fig. K for test and
maintenance procedures
Every 24 hours carry out
tests as indicated in Fig. K
Every 6 months check the
entire installation paying
particular attention to Fig. D
If the equipment fails to
operate as intended check
the electrical connections
as shown in Fig. E