19
COUNTIS E50/E53 - Ref.: 536 419 A
COUNTIS E50/E53
N
P1
S1
P1
S1
L1
(
R
)
L2
(
S
)
L3
(
T
)
P1
S1
S2 S1 S2 S1 S2S1
I2 I3I1
V1 V2 V3 VN AUX
1
2
2
RÉSEAU TRIPHASÉ DÉSÉQUILIBRÉ (3NBL / 4NBL)
L1
(
R
)
L2
(
S
)
L3
(
T
)
S2 S1 S2 S1 S2S1
I2 I3I1
V1 V2 V3 VN AUX
P1
S1
P1
S1
2
2
1
P1
S1
P1
S1
L1
(
R
)
L2
(
S
)
L3
(
T
)
P1
S1
S2 S1 S2 S1 S2S1
I2 I3I1
V1 V2 V3 VN AUX
2
1
2
L1
(
R
)
L2
(
S
)
L3
(
T
)
S2 S1 S2 S1 S2S1
I2 I3I1
V1 V2 V3 VN AUX
P1
S1
P1
S1
2
1
2
En régime IT, ne pas raccorder les
secondaires de TC à la terre.
La solution avec 2 TC diminue de 0,5 % la pré-
cision de la phase dont le courant est déduit par
calcul vectoriel.
GB
Unbalanced three-phase network (3NBL/
4NBL)
The solution with 2 CTs with the 2nd and 3rd phase
current calculated via vectoral summation, results in
an 0.5% reduction in phase accuracy.
D
Dreiphasennetz mit ungleicher belastung
(3NBL/4NBL)
Die Lösung mit 2 Stromwandlern verringert um
ca. 0,5 % die Genauigkeit der Phasen, deren
Strom verktoriell errechnet wird.
I
Rete trifase non equilibrata (3NBL/4NBL)
La soluzione con 2 TA diminuisce di 0,5 % la
precisione di misura delle fasi da cui la corrente
viene dedotta in maniera vettoriale.
NL
Onevenwichtig driefasennet (3NBL/4NBL)
De oplossing met 2 TC vermindert de precisie
van de fase waarvan de stroom vectorieel ver-
minderd wordt, met 0,5 %.
E
Red trifásica desequilibrada (3NBL/4NBL)
La solución con 2 TC disminuye de 0,5 % la pre-
cisión de las medición de las fases sin transfor-
mador ya que el valor de la intensidad se deduce
vectorialmente.
P
Rede trifásica desequilibrada (3NBL/4NBL)
A solução com 2 TC diminui de 0,5 % a precisão
da fase cuja corrente é deduzida vectorialmente.
In IT load, do not connect the secondary of CT
with the earth
Bei einer Erdungsart Typ IT-System
Sekundarseite der SW nicht erden
En régimen IT, no enchufar los secundarios de
TC a la toma de tierra
In IT-net de secundaires van de stroomtransfor-
mator niet verbinden met de aarding.
En esquema IT, no conectar los secundarios de
los TC a tierra.
Em regime IT, não conectar os secundários de
TC à terra
1 Aux.: IEC /CE 110... 400V AC
120... 350V DC
2 Fus.: 0.5 A gG / BS 88 2A gG / 0.5 A class CC
INSTALLATION
4NBL
3NBL
3NBL
3NBL