SOFAR 1.1K~3.3KTL-G3 User manual
Copyright © Shenzhen SOFARSOLAR Co., Ltd
impossible to twist the DC switch from OFF to ON, or ON to OFF. Remove the
screw before turning the DC switch from OFF to ON or ON to OFF.
3.4. Tools
Prepare tools required for installation and electrical connections.
Table 3-3 shows the tools required for installation and electrical connections.
Hammer drill
Recommend drill
dia. 6mm
Used to drill holes on the wall.
Remove and install AC terminal
screws
Turn the screw to connect rear
panel with inverter.
Used to crimp power cables