4.5. Moving of inverter
4.5.1 Manual handling
Unload the inverter from package, horizontally move to the install position. When
open the package, at least two operator insert the hands into the slots on both side
of the inverter and hold the handles.
Figure 4-4 Move inverter from package
Keep the balance when lift the inverter. Required at least two operators
for lifting or use forklift. Inverter is heavy, dropped while being
transported may cause injuries.
Do not put the inverter with wiring terminals contacting the floor
because the power ports and signal ports are not designed to support
the weight of the inverter
When place inverter on the floor, put it above foam or paper to avoid
the damage of the shell of inverter
Use auxiliary handle inside the package for moving the inverter. After