HYD 3000 ... 6000-EP User manual
Copyright © Shenzhen SOFARSOLAR Co., Ltd。
5. Factory Reset
Clean the inverter of the total power generation.
Clean up the historical events recorded in the inverter.
6.
Parallel setting
Please refer to <4.7.3 Link Port 0&1-Cascade communication interface> for
the connection method of the parallel system.
2.Parallel Primary-Replica
1.Parallel Control: Enable or disable parallel functions. Both the master and
the slave must enable this function.
2.Parallel Primary-Replica: Set up the Primary and Replica.Select one
inverter as the Primary and set the others to Replica.
3.Parallel Address: Set the parallel address.Each inverter needs to set a
parallel address, and the parallel address in a parallel system cannot be repeated.
(NOTE:The parallel address is different from the communication address used for
monitoring.)
4.Save: Save after the setup is complete.
7. Bluetooth Reset
8. CT Calibration
To calibrate the direction and phase of the CT, the battery should be charged
or discharged when using this function.
Check if the battery is charging or discharging when calibration fails。