P860 and M1600 power optimizers
Figure 2: Power optimizer clearance
When installing PV modules in a confined space such as Building-integrated
photovoltaic (BIPV) modules, ventilation measures may be required to ensure that
the power optimizers are not exceeding the maximum temperatures stated in their
specifications.
Chapter 2: Installing the Power Optimizers 16
Three Phase Inverter with SetApp Configuration PN: SEXXK-XXXXIXXXX