EasyManua.ls Logo

Specialized EPIC - Internal Cable Routing Procedures

Specialized EPIC
32 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
10
1
s
t
:
O
U
T
E
R
6
m
m
H
E
X
2
n
d
:
I
N
N
E
R
4
m
m
H
E
X
9
OUTER
INNER
Torque the outer bolts to 160 in-lbf / 18.0 Nm, then the inner bolts to 80 in-lbf / 9.0 Nm.
Torque the outer bolts first, then torque the inner bolts. Access the inner bolts with a 4mm hex key
from the outside, through the outer bolt hole, and tighten in the standard clockwise direction.
Q
O
P
R
10
Position the brain reservoir under the dropout and align the bracket (skid plate, O) hole with the vertical dropout hole.
CARBON FRAME: Insert the barrel (P) into the horizontal dropout hole, then install the bolt (Q) and washer (R).
Lightly hand tighten the bolt.
ALLOY FRAME: Install the bolt (Q) and washer (R). Lightly hand tighten the bolt.

Related product manuals