EasyManua.ls Logo

Speck Normblock Multi 65/250 - Installation; Installing the Pump and Connecting It to the Pipework

Speck Normblock Multi 65/250
66 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
04/2019 EN 23
5.3 Installation
The pump should be installed below the water level (max. 3 m) in
intake mode.
VW61.21.022
A
B
Fig. 6
A BADU Block Multi B Norm
block Multi
The BADU Block Multi filter housing must be set up completely on
the foundation.
The Normblock Multi must be set up so that the pump housing
stands freely and is not supported. An elevation on the foundation
must therefore be built for the assembly of the motor feet.
5.3.1 Installing the pump and connecting it to the pipework
1. When installing the pump, align the pump with the discharge
outlet using a spirit level.
2.
Clean and rinse the pump, pipes and connections thoroughly.
NOTICE
The motor can be damaged due to insufficient drainage!
Do not block or seal the drain gap between the pump housing
and the motor.
NOTICE
If it is sealed incorrectly, the thread can be damaged and the
sealing effect can be reduced!
Use Teflon tape for assembly.

Table of Contents

Related product manuals