Maintenance
34 EN 04/2019
8 Maintenance
8.1 Maintenance during operation
Pay attention to calm and vibration-free operation.
Check the mechanical seal for possible leaks.
Check the static seals for possible leaks.
Check running noises in the bearing. Risk of wear.
Check the function of additional connections.
Guarantee operational readiness of reserve pumps. Operate
them once a week.
8.2 Maintenance work
NOTICE
Before maintenance work, close all shut-off valves and drain
all pipes.
When? What?
Regularly Clean strainer basket.
Check screw connections.
Check components for
deformations.
If there is a chance of
frost
Drain pump and pipes sensitive
to frost in good time.
After completing all maintenance work, perform all necessary
meas
ures for start-up. See point 6.1 on page 26