EasyManua.ls Logo

Speed Queen TMB796C - User Manual

Speed Queen TMB796C
62 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
Loading...
Installation
www.comlaundry.com
Drying Tumblers
50 Pound Capacity
75 Pound Capacity
Refer to Page 4 for Model Identification
TMB795C
TMB795C
NOTA: Para bajar una
copia de estas
instrucciones en
espaƱol, visite
www.comlaundry.com.
Part No. M414905R11
August 2008
Keep These Instructions for Future Reference.
(If this machine changes ownership, this manual must accompany machine.)

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the Speed Queen TMB796C and is the answer not in the manual?

Summary

Introduction

Customer Service and Technical Support

Contact information for parts, service, and technical assistance.

Wiring Diagram Location

Location of the wiring diagram for electrical connections and troubleshooting.

Serial Plate Location

Find model and serial numbers on the machine's serial plate.

Safety Information

Important Safety Instructions

Critical safety warnings and precautions for operation, installation, and maintenance.

Specifications and Dimensions

Cabinet Dimensions

Physical dimensions of the tumbler models for installation planning.

Exhaust Outlet Locations

Specifications for the placement and size of exhaust outlets.

Gas Connection Locations

Details on where to connect the gas supply to the tumbler.

Electrical Connection Locations

Information on the location for electrical service connections.

Steam Connection Locations

Specifications for connecting steam supply lines to the tumbler.

Installation

Pre-Installation Inspection

Steps to take before installing the tumbler, including checking for shipping damage.

Location Requirements

Guidelines for selecting a safe and suitable installation location.

Positioning and Leveling the Tumbler

Instructions for correctly positioning and leveling the tumbler.

Bolt-On Angle Option

Details on an option to reduce tumbler depth for door clearance.

Reversing the Loading Door

Procedure for changing the door hinge from right to left.

Pre-Service Checks

Final checks and startup procedures before putting the tumbler into operation.

CE Model Specific Requirements

Tasks required after installation for CE certified models.

Installing CE Gas Drying Tumblers

Specific installation instructions for CE gas drying tumblers.

General Installation Information

Overview of machine configurations and gas types for different countries.

Basic Configuration Procedures

Steps for converting the machine's configuration to the desired country and gas.

Specific Conversion Procedures

Detailed steps for converting gas valve and burner orifice size.

Exhaust Requirements

Exhaust System Layout

Recommendations for positioning tumblers for optimal exhaust.

Make-Up Air Requirements

Specifications for required make-up air openings for proper ventilation.

Venting Guidelines

Instructions for proper exhaust duct sizing, material, and installation.

Individual Venting

Recommendations for exhausting each tumbler individually.

Manifold Venting

Guidelines for using a main collector duct for multiple tumblers.

Gas Requirements

Gas Supply Pipe Sizing and Looping

Guidance on sizing and configuring gas supply piping for optimal pressure.

High Altitude Burner Orifice Sizing

Instructions for reducing burner orifice size for operation at high altitudes.

Electrical Requirements

Grounding Instructions

Essential steps for safely grounding the tumbler according to codes.

CE Models Electrical Notes

Specific electrical considerations for CE certified models.

Service and Grounding Locations

Diagrams showing terminal block and ground locations for various models.

Connecting Electrical Service

Step-by-step guide for connecting the electrical service to the tumbler.

Jumper Configuration Instructions

How to change transformer configuration jumpers for different voltage services.

Ferrite Ring Installation

Procedure for installing the ferrite ring to protect electronic controls.

50 Pound Gas;Steam Electrical Specs

Electrical specifications for 50 lb gas and steam models.

75 Pound Gas;Steam Electrical Specs

Electrical specifications for 75 lb gas and steam models.

Electric Models Electrical Specs

Electrical specifications for 50 and 75 lb electric models.

Steam Requirements

Steam Piping Recommendations

Guidelines for steam supply and return line installation, traps, and unions.

Steam Trap & Condensate Connections

Procedure for installing steam traps and connecting condensate return lines.

Thermal Oil Prep Models

Notes on customer responsibility for thermal oil heating system installation.

Single Drop Timer

Single Drop Timer: Power-Up Mode

Initial control status and factory status indication.

Single Drop Timer: Ready Mode

Control state waiting for coin satisfaction.

Single Drop Timer: Start Mode

Control state after coin satisfaction, waiting for start button.

Single Drop Timer: Run Mode

Control state when the tumbler cycle is actively running.

Setting Dry Time Dipswitches

Instructions for programming heat time and cool down time using dipswitches.

Dipswitch Settings Reference

Table detailing dipswitch settings for various drying times.

Rotary Coin Drop Timer

Installing Accessory Timing Cams

Procedure for installing cams to change vending times.

Removing Existing Timing Cam

Steps to safely remove the current timing cam.

Installing New Timing Cam

Guide for fitting and seating a new timing cam onto the motor shaft.

Adjustments

Adjusting Gas Burner Air Shutter

How to adjust air shutter for proper flame and combustion efficiency.

Adjusting Airflow Switch

Procedure for adjusting the airflow switch for proper heat system operation.

Loading Door Switch Adjustment

Information on the loading door switch's preset adjustment.

Adjusting Loading Door Catch

How to adjust the door catch tension for proper closure.

Drive Belt Tension Adjustment

Adjusting drive belt tension for nonreversing and reversing models.

Removing Tumbler from Service

Summary

Introduction

Customer Service and Technical Support

Contact information for parts, service, and technical assistance.

Wiring Diagram Location

Location of the wiring diagram for electrical connections and troubleshooting.

Serial Plate Location

Find model and serial numbers on the machine's serial plate.

Safety Information

Important Safety Instructions

Critical safety warnings and precautions for operation, installation, and maintenance.

Specifications and Dimensions

Cabinet Dimensions

Physical dimensions of the tumbler models for installation planning.

Exhaust Outlet Locations

Specifications for the placement and size of exhaust outlets.

Gas Connection Locations

Details on where to connect the gas supply to the tumbler.

Electrical Connection Locations

Information on the location for electrical service connections.

Steam Connection Locations

Specifications for connecting steam supply lines to the tumbler.

Installation

Pre-Installation Inspection

Steps to take before installing the tumbler, including checking for shipping damage.

Location Requirements

Guidelines for selecting a safe and suitable installation location.

Positioning and Leveling the Tumbler

Instructions for correctly positioning and leveling the tumbler.

Bolt-On Angle Option

Details on an option to reduce tumbler depth for door clearance.

Reversing the Loading Door

Procedure for changing the door hinge from right to left.

Pre-Service Checks

Final checks and startup procedures before putting the tumbler into operation.

CE Model Specific Requirements

Tasks required after installation for CE certified models.

Installing CE Gas Drying Tumblers

Specific installation instructions for CE gas drying tumblers.

General Installation Information

Overview of machine configurations and gas types for different countries.

Basic Configuration Procedures

Steps for converting the machine's configuration to the desired country and gas.

Specific Conversion Procedures

Detailed steps for converting gas valve and burner orifice size.

Exhaust Requirements

Exhaust System Layout

Recommendations for positioning tumblers for optimal exhaust.

Make-Up Air Requirements

Specifications for required make-up air openings for proper ventilation.

Venting Guidelines

Instructions for proper exhaust duct sizing, material, and installation.

Individual Venting

Recommendations for exhausting each tumbler individually.

Manifold Venting

Guidelines for using a main collector duct for multiple tumblers.

Gas Requirements

Gas Supply Pipe Sizing and Looping

Guidance on sizing and configuring gas supply piping for optimal pressure.

High Altitude Burner Orifice Sizing

Instructions for reducing burner orifice size for operation at high altitudes.

Electrical Requirements

Grounding Instructions

Essential steps for safely grounding the tumbler according to codes.

CE Models Electrical Notes

Specific electrical considerations for CE certified models.

Service and Grounding Locations

Diagrams showing terminal block and ground locations for various models.

Connecting Electrical Service

Step-by-step guide for connecting the electrical service to the tumbler.

Jumper Configuration Instructions

How to change transformer configuration jumpers for different voltage services.

Ferrite Ring Installation

Procedure for installing the ferrite ring to protect electronic controls.

50 Pound Gas;Steam Electrical Specs

Electrical specifications for 50 lb gas and steam models.

75 Pound Gas;Steam Electrical Specs

Electrical specifications for 75 lb gas and steam models.

Electric Models Electrical Specs

Electrical specifications for 50 and 75 lb electric models.

Steam Requirements

Steam Piping Recommendations

Guidelines for steam supply and return line installation, traps, and unions.

Steam Trap & Condensate Connections

Procedure for installing steam traps and connecting condensate return lines.

Thermal Oil Prep Models

Notes on customer responsibility for thermal oil heating system installation.

Single Drop Timer

Single Drop Timer: Power-Up Mode

Initial control status and factory status indication.

Single Drop Timer: Ready Mode

Control state waiting for coin satisfaction.

Single Drop Timer: Start Mode

Control state after coin satisfaction, waiting for start button.

Single Drop Timer: Run Mode

Control state when the tumbler cycle is actively running.

Setting Dry Time Dipswitches

Instructions for programming heat time and cool down time using dipswitches.

Dipswitch Settings Reference

Table detailing dipswitch settings for various drying times.

Rotary Coin Drop Timer

Installing Accessory Timing Cams

Procedure for installing cams to change vending times.

Removing Existing Timing Cam

Steps to safely remove the current timing cam.

Installing New Timing Cam

Guide for fitting and seating a new timing cam onto the motor shaft.

Adjustments

Adjusting Gas Burner Air Shutter

How to adjust air shutter for proper flame and combustion efficiency.

Adjusting Airflow Switch

Procedure for adjusting the airflow switch for proper heat system operation.

Loading Door Switch Adjustment

Information on the loading door switch's preset adjustment.

Adjusting Loading Door Catch

How to adjust the door catch tension for proper closure.

Drive Belt Tension Adjustment

Adjusting drive belt tension for nonreversing and reversing models.

Removing Tumbler from Service

Speed Queen TMB796C Specifications

General IconGeneral
BrandSpeed Queen
ModelTMB796C
CategoryDryer
LanguageEnglish

Related product manuals