EasyManua.ls Logo

STIEBEL ELTRON DHF 13 C - Installation Site; Minimum Clearances; Preparation; Water Installation

STIEBEL ELTRON DHF 13 C
112 pages
Go to English
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
20 | DHF C www.stiebel-eltron.com
INSTALLATION
Preparation
Installation set, surface-mounted
- Solder fitting – copper pipe for a Ø12mm solder connection
- Press fitting – copper pipe
Load shedding relay (LR 1-A)
The load shedding relay for installation in the distribution board
provides priority control for the instantaneous water heater when
other appliances, suchas electric storage heaters, are being op-
erated simultaneously.
9. Preparation
9.1 Installation site
!
Material losses
Install the appliance in a room free from the risk of frost.
f Always install the appliance vertically and near the draw-off
point.
The appliance is suitable for undersink and oversink installation.
Undersink installation
D0000042705
1
2
1 Cold water inlet
2 DHW outlet
Oversink installation
D0000042706
12
1 Cold water inlet
2 DHW outlet
Note
f Mount the appliance on the wall. The wall must have
sufficient load bearing capacity.
9.2 Minimum clearances
≥50≥50
≥90
≥90
D0000060809
f Maintain the minimum clearances to ensure trouble-free op-
eration of the appliance and facilitate maintenance work.
9.3 Water installation
Never operate with preheated water.
f Flush the water line thoroughly.
Flow rate
f Ensure that the flow rate required to switch on the appliance
is achieved (see chapter "Installation/ Specification/ Data
table/ ON"). If the required flow rate is not achieved when
the draw-off valve is fully opened, increase the water line
pressure.
Taps
Use appropriate pressure taps. Open vented taps are not per-
missible.
Thermostatic pressure valves must be suitable for hydraulically
controlled instantaneous water heaters.
Note
Never use the 3-way ball shut-off valve in the cold water
inlet to reduce the flow rate. The 3-way ball shut-off valve
is intended only to shut off the cold waterinlet.
Permissible water line materials
- Cold water supply line:
Pipes made from galvanised steel, stainless steel, copper or
plastic
!
Material losses
If you use plastic pipework in the cold water supply line,
you must observe the following condition:
f Install a metal pipe approx. 1m in length at the ap-
pliance cold water connection. Then you can install
the plastic pipework.

Table of Contents

Other manuals for STIEBEL ELTRON DHF 13 C

Related product manuals