• Nail the treated plywood panels to the FLOOR BANDS using 6-penny galvanized nails every 16
inches.
• Using a chalk line, mark the location of your FLOOR JOISTS on the boards and nail the boards to
the FLOOR JOISTS using 6-penny galvanized nails every 16 inches along the joist direction.
Your Floor-Base is now ready. The walls of the cooler will be anchored to this base.
This is also a good time to ensure that the base is completely level before continuing with the room
build.
EFIICIENCY PRO TIP
Want to make your cooler more efficient? Flip the base and insulate the bottom of the base in between
the FLOOR JOISTS. Rigid foam panels properly cut (sealing all seams with expandable foam) or using
Spray Foam insulation are both great alternatives. This will increase the R-Value of the floor to make
your cooler more efficient. NOTE: We will be insulating the floor on the inside with rigid foam panels
after the walls are installed. (DO NOT USE FIBERGLASS!!)