OPTIONAL: ELECTRICAL PRE-WIRING
IMPORTANT
Once your cooler is built and before insulating it, you can have a certified electrician run the electrical
if you wish to have conduit run along the framed walls so it is not exposed inside (or outside) the
cooler. This is a personal choice and it is not necessary. Wiring CAN ALWAYS BE DONE EXTERNALY
EVEN AFTER INSULATION IS IN PLACE (with exposed conduit).
It is ok to run flexible or hard conduit in the walls, next to the framing, but BE AWARE that the
outlets WON’T be mounted on the framing at this point.
ALL OUTLETS WILL (and should) be surface mounted - on TOP of the insulation. Your electrician
should run the wiring and locate for you the connection points for the outlet boxes to be mounted
after you have insulated your cooler. Make sure you mark the locations and keep track of them as
you insulate your cooler.
On occasion, condensation may drip from the front of your air conditioner so make sure all electrical
is mounted to the side of the air conditioner and not directly beneath.
Installing additional 2x4’s in between studs may be required to anchor the electrical boxes
depending on the location of the particular outlet you plan to have.
We recommend surface mounting the electrical boxes inside of the cooler to minimize
compromising the insulation integrity and the chance for condensation within the electrical box.