WWW.STOREITCOLD.COM
SUPPORT@STOREITCOLD.COM
35
2019 © Store It Cold, LLC. Rev 2019-04A All Rights Reserved.
INSTALLING THE ROOF
PRO TIP
Correct roof installation is crucial for your Outdoor Shed. Installing roof felt, shingles, etc.
is a 2-person job. If you are new to roofing and lack experience, we would recommend to
get professional help or an experienced helper.
There are many resources on the Internet for guidance on how to properly install roof
felt and shingles but most important:
FOLLOW THE MANUFACTURER’S INSTRUCTIONS FOR INSTALLATION OF ROOF FELT AND
SHINGLES - THEY ARE INCLUDED FOR A REASON.
Here are some common tips of the trade when installing the drip edge, roof felt and shingles.
DRIP EDGE
• Install your drip edge on the eaves first - before the felt installation
• The drip edge should be fastened with galvanized nails about 12 inches apart.
• Do not install the drip edge on the front and back sides – do it after the roof felt installation