EasyManua.ls Logo

Store It Cold CoolBot PRO - Page 34

Store It Cold CoolBot PRO
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WWW.STOREITCOLD.COM
SUPPORT@STOREITCOLD.COM
34
2019 © Store It Cold, LLC. Rev 2019-04A All Rights Reserved.
Cut and install the 7/16 in. OSB boards to go on top of the rafters. Nail the OSB to the rafters using
3.5” galvanized nails every 6”. Use a chalk line to mark the rafter line on the OSB board to make
sure you nail into the rafter and you don’t leave any loose nails.
We did not install rake boards on the front and back (fascia). When installing the OSB boards, we left
and overhang on the front and the back of around ~3” and just finished with the drip edge.
Measure, cut and install the front and back siding to cover the roof frame. Do not forget to cut and
opening for the Louvered Aluminum Soffit vents. Nail to the rafters and Top Plate of the walls.
Next step is to install the fascia boards on the eves of the roof.
Install one 1x4x8 trim board on each side by nailing 2” galvanized nails right into the 2x4 rafters.
Using the flat edge of a framing square sitting on top of the OSB board, align the top of the trim
board (1x4) until it touches the flat side of the square and nail it to the rafter.

Other manuals for Store It Cold CoolBot PRO

Related product manuals