EasyManua.ls Logo

Store It Cold CoolBot PRO - CoolBot Pro and A;C Common Checks; A;C Unit Cleaning and Maintenance

Store It Cold CoolBot PRO
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
WWW.STOREITCOLD.COM
SUPPORT@STOREITCOLD.COM
25
2019 © Store It Cold, LLC. Rev 2019-04A All Rights Reserved.
Screw the walls together using #10 x 3" long polymer coated exterior screws staggered every
12".
PRO TIP
Before anchoring all the walls together and to the floor, ensure that the exterior of the walls align
with the chalk lines (or the edges of the Floor-Base) and that they are level and plumb.
A. FOR COOLERS WITH A FLOOR-BASE BUILT FOLLOWING THE INSTRUCTIONS FROM THIS GUIDE
Anchor your walls using #10 x 3 in. long polymer coated screws driving them into the floor base.
We recommend screws spaced at least 16” apart along each wall.
B. FOR COOLERS WITHOUT A FLOOR-BASE AND BUILT DIRECTLY OVER A LEVEL CONCRETE PAD
(ECO-COOLER)
Anchor the bottom wall plates to the concrete pad using an appropriate anchor. We
recommend anchors spaced at least 16" apart along each wall.
NOTE: Your sales person at the hardware store can guide you choosing the proper anchors for
the bottom plates. DON’T FORGET! Since your cooler walls a directly over concrete, cut the
BOTTOM PLATE of the FRONT WALL where the door opening is (W*).

Other manuals for Store It Cold CoolBot PRO

Related product manuals