WWW.STOREITCOLD.COM
SUPPORT@STOREITCOLD.COM
31
2019 © Store It Cold, LLC. Rev 2019-04A All Rights Reserved.
• Nail the panels to the walls at the top, bottom and along the studs every 6 inches using 1 ¼”
finishing nails trough the siding and into the studs.
• The siding will be flush with the second top plate (from top to bottom) and the bottom part
of the siding may hang down past the bottom plate. Leave the last TOP PLATE free to be able
to nail the front and back siding after the roof is installed