84 EN/09.2019/G41 © STULZ GmbH – all rights reserved
cybercool 2 screw original insTrUcTions
Oil filling
-
ties, contact technical support.
Procedure:
required oil.
3. Evacuate the refrigerant from the compressor and collect it, until atmospheric pressure is reached.
-
ing to the regulations in force.
compressor.
-
into the refrigerant circuit.
Oil level
Oil heater
max. oil temperature sensor
oil heater
oil level sensor