Section 6
OPERATION- SUPERVISOR II
35
sure. If adjustments are necessary, see Control
System Adjustments.
7. Observe the operating temperature. If the operat-
ing temperature exceeds 200
_
F(93
_
C), the
cooling system and installation environment
should be checked.
8. Open shut--off valve to the service line.
9. Reinspect the compressor for temperature and
leaks the following day.
6.11 SUBSEQUENT START-UP PROCEDURE- SU-
PERVISOR II
On subsequentstart--ups, check that the properlev-
el is visible in the fluid level sight glass and simply
press “
I
” for manual or “
” for automatic operation.
When the compressor is running, observe the vari-
ous parameter displays.
6.12 SHUTDOWN PROCEDURE- SUPERVISOR II
To shut the compressor down, push “
O
” pad.