EasyManua.ls Logo

Sullair LS-25 - Daily Operation

Sullair LS-25
120 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Section 6
SUPERVISOR
40
tion LED on the graphics map as a visual reminder.
DO NOT remove caps, plugs, and/or other com-
ponents when compressor is running or pres-
surized.
Stop compressor and relieve all internal pres-
sure before doing so.
6.10 DAILY OPERATION
Following a routine start, observe the various
Supervisor displays to check that normal readings
are being made - previous records are very helpful
in determining the normalcy of the measurements.
These observations should be made during all ex-
pected modes of operation (i.e. full load, no-load,
different line pressures, cooling water tempera-
tures, etc.).
During the initial start-up or servicing of the pack-
age, fluid may have to be added to the sump ves-
sel to restore an adequate level. Frequent fluid ad-
ditions to maintain said level would be indicative of
excessive fluid consumption, and should be inves-
tigated - see the Troubleshooting Section of this
manual for probable cause and remedy.

Related product manuals