TABLE OF CONTENTS
Section 4
INSTALLATION
31 4.1 MOUNTING OF COMPRESSOR
31 4.2 VENTILATION AND COOLING
31 4.3 SERVICE AIR PIPING
31 4.4 COUPLING ALIGNMENT CHECK
31 4.5 FLUID LEVEL CHECK
32 4.6 ELECTRICAL PREPARATION
32 4.7 MOTOR ROTATION DIRECTION CHECK
Section 5
OPERATION
33 5.1 GENERAL
33 5.2 PURPOSE OF CONTROLS
34 5.3 PARAMETERS SETUP
35 5.4 OPERATING THE COMPRESSOR
36 5.5 SUPERVISOR II OUTPUT RELAYS
37 5.6 INITIAL START-UP PROCEDURE
37 5.7 SUBSEQUENT START-UP PROCEDURE
37 5.8 SHUTDOWN PROCEDURE
Section 6
MAINTENANCE
39 6.1 MAINTENANCE INTRODUCTION
39 6.2 DAILY OPERATION
39 6.3 MAINTENANCE AFTER INITIAL 50 HOURS OF
OPERATION
39 6.4 MAINTENANCE AS REQUIRED BY LUBRICATION
GUIDE (SECTION 3)
39 6.5 FLUID CHANGE
39 6.6 SEPARATOR MAINTENANCE
39 6.7 PARTS REPLACEMENT AND ADJUSTMENT PROCEDURES
39 FLUID FILTER MAINTENANCE
40 AIR FILTER MAINTENANCE
41 AIR/OIL SEPARATOR ELEMENTS REPLACEMENT
42 OIL RETURN/SIGHT GLASS MAINTENANCE
42 DIFFERENTIAL PRESSURE REGULATOR ADJUSTMENT
42 DRIVE COUPLING INSTALLATION AND ALIGNMENT
Section 7
TROUBLESHOOTING 45 7.1 TROUBLESHOOTING
45 7.2 TROUBLESHOOTING GUIDE