2.1 SET-UP AND INSTALLATION
Once at the installation location, the adsorption dryers of the series SD-220 / SD-
600, which are supplied with a base frame, must be positioned so that sides are
easily accessible. The piping is to be connected to the adsorption dryer at a light
slope. A shut-off valve is to be installed on the inlet and outlet sides of the
adsorption dryer. Also, a by-pass pipe with an additional shut-off valve should be
mounted onto the adsorption dryer, in order to be able to guarantee an
uninterrupted supply of compressed air in case the adsorption dryer breaks down.
Should vibrations occur on the installation location, the adsorption dryer is to be
placed onto vibration dampers.
Since the adsorption dryer has already been completely wired at our factory, the
customer only has to connect the power supply cable to the terminal strip according
to the supplied wiring diagrams.
* Advice
Should you still have questions regarding installation, you can
request installation blueprints separately from
S
S
u
u
l
l
l
l
a
a
i
i
r
r
®
®
,
,
Michigan
City, IN.
CAUTION!
Do not hydrotest dryer, all vessel assemblies are factory
pressure tested per design requirements prior to release from the
manufacturer.