TABLE OF CONTENTS
Section 4
INSTALLATION
(CONT).
18 4.6 ELECTRICAL PREPARATION
18 4.7 MOTOR ROTATION DIRECTION CHECK
Section 5
OPERATION- ELECTRO-
MECHANICAL
19 5.1 GENERAL
19 8.2 PURPOSE OF CONTROLS
20 5.3 INITIAL START-UP PROCEDURE
20 5.4 SUBSEQUENT START-UP PROCEDURE
20 5.5 SHUTDOWN PROCEDURE
Section 6
SUPERVISOR CONTROLLERâ„¢
22 Figure 6-1 Supervisor Controller Panel
Section 7
MAINTENANCE
23 7.1 GENERAL
23 7.2 DAILY OPERATION
23 7.3 MAINTENANCE AFTER INITIAL 50 HOURS
OF OPERATION
23 7.4 MAINTENANCE AFTER FIRST 1000 HOURS
23 7.5 FLUID CHANGE
24 7.6 FILTER MAINTENANCE
24 7.7 SEPARATOR MAINTENANCE
24 7.8 PARTS REPLACEMENT AND ADJUSTMENT
PROCEDURES
24 FLUID FILTER ELEMENT REPLACEMENT
(100-150HP/75-112KW)
24 FLUID FILTER ELEMENT REPLACEMENT
(200-250HP/ 150-187KW)
24 AIR FILTER MAINTENANCE (100-150HP/75-112KW)
26 AIR FILTER MAINTENANCE (200-250HP/ 150-187KW)
26 SEPARATOR ELEMENT REPLACEMENT
27 CONTROL SYSTEM ADJUSTMENT
28 DRIVE COUPLING INSTALLATION AND ALIGNMENT
Section 8
TROUBLESHOOTING 29 8.1 TROUBLESHOOTING
29 8.2 TROUBLESHOOTING GUIDE
Continued on next page