Contents v
5. FC Module FRUs 5–1
5.1 Replacing an I/O Controller Module 5–2
5.1.1 Saving the Configuration Settings to NVRAM 5–2
5.1.2 Removing an I/O Controller Module 5–3
5.1.3 Installing an I/O Controller Module 5–6
5.1.4 Monitoring the Automatic Firmware Update with a Recently
Installed Controller FRU 5–7
5.1.5 SES Firmware Update Sometimes Required with I/O Controller
Module Replacements 5–8
5.1.6 Converting a Dual-Controller Array to a Single Controller Array
5–10
5.1.7 I/O Controller Replacement for a Single-Controller or Powered-Off
Array 5–10
5.2 Replacing I/O Expansion Modules 5–11
5.2.1 Removing the I/O Expansion Module 5–11
5.2.2 Installing the I/O Expansion Module 5–11
5.3 Installing Small Form-Factor Pluggable Transceivers 5–12
5.4 Installing a RAID/Expansion Chassis FRU 5–14
5.5 Converting an FC JBOD into an FC RAID Array 5–17
6. SCSI Module FRUs 6–1
6.1 Replacing a SCSI Controller Module 6–2
6.1.1 Saving the Configuration Settings to NVRAM 6–2
6.1.2 Removing a SCSI Controller Module 6–2
6.1.3 Installing a SCSI Controller Module 6–3
6.1.4 Monitoring the Automatic Firmware Update with a Recently
Installed Controller FRU 6–4
6.1.5 Replacing a Single-Controller Array or Powered Off Array 6–5
6.2 Replacing SCSI I/O Modules 6–6
6.2.1 Installing Gaskets If Needed 6–6
6.2.2 Removing the SCSI I/O Module 6–7