83
• Please check the country supported by this product at http:// support.sungrow-
power.com/.
• Set Country/Region to the country/region where the inverter is installed. Oth-
erwise, the inverter may report a fault.
step 10 After a plant is successfully created, return to the App home page to view the plant
information.
- - End
6.5 Optimizer Physical Layout (Optional)
• If PV modules are installed and optimizers are configured, check to ensure that all devi-
ces are reliably installed.
• Remove QR code labels from the optimizers and attach them to corresponding square
cells on the physical layout.
• Please refer to the optimizer user manual for details of the optimizer physical layout.
User Manual 6 Commissioning