EasyManua.ls Logo

Sungrow SG2K5-S - Page 63

Sungrow SG2K5-S
95 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
User Manual 7 LCD Operation
55
E-total: 1999kWh
E-today: 20.0kWh
Ipv: 2.9A
Grid Vtg:
Grid Frq:
221.7V
50.0Hz
Vpv: 250.0V
Pac:
Status:
3456W
Running
* The images shown here are for your reference only. For D series, both PV1
and PV2 will be displayed.
Tab. 7-2 Status Description
State
Description
Standby
The inverter waits for sufficient sunlight, then the DC voltage
recovers.
Startup
The inverter is initializing and synchronizing with the grid.
Running
After being energized, the inverter tracks the PV strings
maximum power point (MPP) and feeds the AC power to grid.
This mode is the normal mode.
Turn off
The inverter will stop running by manual “OFF” via the LCD
menu. Set to “ON” if you want to restart the inverter.
Upgrading
The DSP or LCD firmware is upgrading.
Error xxx
If an error occurs, the inverter will automatically stop operation,
trigger the AC relay and show “Error xxx” on the LCD with the
indicator red (xxx is the error code).
Once the error is cleared in recovery time, the inverter will
automatically try to resume normal operation. The recovery
time can be set via the App.

Table of Contents

Related product manuals