4.3 Commissioning
Before connecting the controller to the mains, ensure system is filled and ready for
operation, please connecting all sensors to the input terminals, pumps or valves to
the output terminals and fill the system.
After power is switch on, the controller runs an initialization phase for 5 seconds, then
controller runs a commissioning menu, it leads the user through the most important
adjustment channels needed for operating the system.