SuperServer 5019C-MHN2 User's Manual
22
2.4 Installing the Server into a Rack
You should now have rails attached to both the chassis and the rack. The next step is to
install the server into the rack.
1. Line up the rear of the chassis rails with the front of the rack rails.
2. Slide the chassis rails into the rack rails, keeping the pressure even on both sides (you
may have to press the locking tabs when inserting). See Figure 2-1.
3. When the server has been pushed completely into the rack, you should hear the locking
tabs "click".
Figure 2-1. Installing the Server into a Rack
Note: Figures are for illustrative purposes only. Always install servers to the bottom of a rack
Warning: Stability hazard. The rack stabilizing mechanism must be in place, or the
stabilize the rack can cause the rack to tip over.