EasyManua.ls Logo

SureShade ATF-SG - Preparation; Parts and Quantities

Default Icon
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
13
© 2018 Rodan Enterprises LLC t/a SureShade®
ATF Installation Guide
PREPARATION
4
PARTS AND QUANTITIES
Many of the provided parts are pre-assembled before shipping. This helps to ensure all necessary parts are
included and checked for proper ȴt before delivery. Ensure all assembled parts are contained in the shipping
crate BEFORE starting installation. (See Figure 1.)
PART QUANTITY
Shade speciȴcation drawing ȃ speciȴc to your shade and provided as a separate
document
1
Mounting clamps w/mounting hardware and bolt covers 4
Pre-assembled actuators 2
Roller assembly w/mounting hardware 1
Outer crossbar w/mounting hardware 1
Mid-crossbar w/mounting hardware 1
Pre-rolled canvas (attached to roller assembly) 1
Pre-programmed electronic controller w/wireless remote 1
Starboard and port control harness w/Deutsch connectors 2