EasyManua.ls Logo

SureShade ATF-SG - Skill Level of Installer; Installation Time Frame

Default Icon
50 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
PREPARATION
16
© 2018 Rodan Enterprises LLC t/a SureShade®
ATF Installation Guide
SKILL LEVEL OF INSTALLER
Must be able to read a tape measure and be comfortable using a hand drill.
For installation of shade framework - intermediate skill level
- Read tape measure
- Use hand drill
- Able to lift 35+ lbs
Electrical installation - wiring of shade
Wiring of shade to the boat should be done by an experienced marine electrician.
INSTALLATION TIME FRAME
It is recommended that two people perform the installation. Depending on the type of mount (surface or
integrated) and the complexity of the wire run to the boat’s power source, the installation can take anywhere
from 10 – 16 hours.