EasyManua.ls Logo

Suzuki DF250S - Engine Operation: Starting; Pre-Start Engine Checks; Starting the Engine Procedure

Suzuki DF250S
53 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
23
BREAK-IN
Proper operation during this break-in period will
help ensure maximum life and performance
from your engine. The following guidelines will
explain proper break-in procedures.
Break-in period: 10 hours
Break-in procedure
1. For the initial 2 hours:
Allow sufficient idling time (about 5 minutes)
for the engine to warm up after cold engine
starting.
After warming up, run the engine at idling
speed or the lowest in-gear speed for about
15 minutes.
During the remaining 1 hour and 45 minutes,
if safe boating conditions permit, operate the
engine in gear at less than 1/2 (half) throttle
(3000 r/min.).
NOTE:
You may throttle up beyond the recommended
operating range to plane your boat, then imme-
diately reduce the throttle to the recommended
operating range.
2. For the next 1 hour:
Safe boating conditions permitting, operate
the engine in gear at 4000 r/min. or at three-
quarter throttle. Avoid running the engine at
full throttle.
CAUTION
Failure to follow the break-in procedures
described below can result in severe
engine damage.
CAUTION
High speed without sufficient warm-up
may cause severe engine damage such
as piston seizure.
3. Remaining 7 hours:
Safe boating conditions permitting, operate
the engine in gear at desired engine speed.
You may occasionally use full throttle; how-
ever do not operate the engine continuously
at full throttle for more than 5 minutes at any
time.
NOTE:
For the remaining 7 hours of break-in operation,
you may use full throttle; however do not oper-
ate the engine continuously at full throttle for
more than 5 minutes at a time or severe engine
damage such as seizure may result.

Table of Contents

Related product manuals