EasyManua.ls Logo

Sym GTS 250 - Page 54

Sym GTS 250
248 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
4. Fuel System
4-9
Assembly
Install main jet, needle jet holder, needle jet, slow
jet and air adjustment screw.
Caution
Set the air adjustment screw in according to
number of turns noted before it was removed.
Install the float valve, float, and float pin.
Checking fuel level
Caution
Check again to ensure float valve, float for
proper installation.
To ensure correct measurement, position the
float meter in such a way so that float chamber
face is vertical to the main jet.
Fuel level: 18.5mm
Installation of carburetor
Install carburetor in the reverse order of removal.
Following adjustments must be made after
installation.
˙Throttle cable adjustment.
˙Idle adjustment
To this chapter contents
Throttle cable adjustment nuts
Slow jet
Main jet
1 screw
Float
Air adjustment screw

Table of Contents

Related product manuals