EasyManua.ls Logo

Sym GTS 250 - 5. Removal & Installation of Engine; Engine Removal

Sym GTS 250
248 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
5. Removal & Installation of Engine
5-1
Operational Precautions ·················· 5-1
Engine Removal ······························ 5-2
Engine Hanger ································ 5-6
Rear Fork ······································· 5-7
Removal of Engine Bush ·················· 5-9
Installation of Engine ······················· 5-10
Operational Precautions
General Information
Engine must be supported by a bracket or adjustable tool in height.
The following parts can be serviced with the engine installed on the frame.
1. Carburetor
2. Driving disk, driving belt, clutch, and transporting disk
3. Final reduction gear mechanism
4. AC. Generator
Specification
Item
LM25W
Engine Oil Capacity
Replacement
1,200 c.c.
Disassemble
1,400 c.c.
Gear Oil Capacity
Replacement
170 c.c.
Disassemble
180 c.c.
Capacity of coolant
Engine + radiator
850 c.c.
Reservoir upper
420 c.c.
Torque Values
Engine hanger bolt (frame side) 7.5~9.5kgf-m
Engine hanger nut (engine side) 7.5~9.5kgf-m
Bolt of rear cushion upper connection 3.5~4.5kgf-m
Bolt of rear cushion lower connection 2.4~3.0kgf-m
Rear wheel axle nut 11.0~13.0kgf-m
5
Home page
Contents

Table of Contents

Related product manuals