Air Chiller System (ACS) and Chiller Panel Getting Started Guide for the DMA 850 Page 18
Chapter 2:
Installing the Air Chiller System
Unpacking/Repacking the ACS
Unpacking and installation of the Air Chiller System is typically performed by a TA Instruments Service
Representative. Retain all of the shipping hardware and boxes from the accessory in the event you wish to
repack and ship your accessory. Refer to the TA Instruments document Unpacking the Air Chiller System
for further instructions.
Preparing the Accessory
Before shipment, the ACS is inspected so that it is ready for operation upon proper installation. Preparing
the accessory for installation involves the following procedures:
• Inspecting the System
for shipping damage and missing parts
• Choosing a Location
• Adjusting the Anti-Tilt Bar Feet
CAUTION: To avoid mistakes, read this entire chapter before you begin installation.
MISE EN GARDE: Pour éviter de commettre des erreurs, lisez tout le chapitre avant de commencer
l'installation.