EasyManua.ls Logo

TA Instruments Q10 User Manual

TA Instruments Q10
76 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #47 background image
DSC Q Series Getting Started Guide
47
Using the DSC
All of your DSC experiments will have the following general outline. In some cases, not all of these steps will
be performed. The majority of these steps are performed using the instrument control software. The instructions
needed to perform these actions can be found in the online help in the instrument control program; therefore,
they will not all be covered in detail here.
Calibrating the instrument
Selecting the pan type and material
Preparing the sample
Creating or choosing the test procedure and entering sample and instrument information through the TA
instrument control software
Setting the purge gas flow rate
Loading the sample and closing the cell lid
Starting the experiment.
To obtain accurate results, follow procedures carefully.
Before You Begin
Before you set up an experiment, ensure that the DSC and the controller have been installed properly. Make
sure you have:
Made all necessary cable connections from the DSC to the computer
Connected all gas lines
Powered up the unit
Connected any desired accessories
Connected the instrument with the controller
•Become familiar with controller operations
•Calibrated the DSC, if necessary.
Chapter 3
Use, Maintenance, & Diagnostics

Table of Contents

Question and Answer IconNeed help?

Do you have a question about the TA Instruments Q10 and is the answer not in the manual?

TA Instruments Q10 Specifications

General IconGeneral
BrandTA Instruments
ModelQ10
CategoryMeasuring Instruments
LanguageEnglish

Summary

Notices

Regulatory Compliance

Safety Standards

Lists safety requirements for electrical equipment from various regulatory bodies.

Electromagnetic Compatibility Standards

Details EMC standards for industrial, scientific, and medical equipment.

Safety

Instrument Symbols and Electrical Safety

Explanation of warning symbols and electrical safety precautions.

Handling Liquid Nitrogen

Safe handling procedures and precautions for using liquid nitrogen.

Thermal Safety and Instrument Handling

Precautions for thermal hazards and lifting the heavy DSC instrument.

Introducing the DSC

Overview and System Components

General introduction to DSC and its main components, including the cell.

Cooling Accessories

Description of FACS, RCS, Quench Cooler, and LNCS for temperature control.

DSC Touch Screen and Keypad Interfaces

Operation of Q2000/Q200 touch screen, Q1000/Q100 touch screen, and Q20/Q10 keypad.

Options, Accessories, and Specifications

Overview of accessories, specialized cells, and instrument specifications.

Installing the DSC

Initial Setup and Connections

Covers unpacking, inspecting, choosing location, and connecting cables/lines.

Gas Lines and Cooling Setup

Procedure for connecting purge and cooling gas lines to the DSC.

Power Configuration and Startup

Covers voltage configuration, power, starting, and shutting down the DSC.

Installing Cooling Accessories

Step-by-step guide to installing FACS, Quench Coolers, and additional items.

Using, Maintaining, and Diagnosing the DSC

DSC Experiment Workflow

Steps for preparing, running, and stopping DSC experiments.

DSC Calibration Procedures

Detailed procedures for various DSC calibrations including Tzero, heat capacity, and pressure.

Autosampler Calibration

Instructions for calibrating the DSC Autosampler for accurate sample handling.

Instrument Maintenance and Parts

Procedures for cleaning, troubleshooting, and replacing fuses and parts.

Related product manuals