EasyManuals Logo

Tait TB7100 Service Manual

Tait TB7100
370 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #122 background imageLoading...
Page #122 background image
124 Servicing Procedures TB7100 Service Manual
© Tait Electronics Limited October 2005
Task 2
Final Test
Test the base station to confirm that it is fully functional again.
The recommended tests are listed in Figure 8.1. It is good practice to record
the test results on a separate test sheet. A copy of the test sheet can be
supplied to the Customer as confirmation of the repair.
Task 3
Final
Administration
The final administration tasks are the standard workshop procedures for
updating the fault database and returning the repaired base station to the
Customer with confirmation of the repair.
If the base station could not be repaired for one of the following reasons:
fault not located
repair of fault failed
required repair is level-3 repair
Level-1 service centres should return the faulty base station to the nearest
ASC, and level-2 service centres should return the base station to the ISC.
Supply details of the Customer, the fault and, if applicable, the attempted
repair.

Table of Contents

Other manuals for Tait TB7100

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Tait TB7100 and is the answer not in the manual?

Tait TB7100 Specifications

General IconGeneral
BrandTait
ModelTB7100
CategoryAccessories
LanguageEnglish

Related product manuals