EasyManuals Logo

Takeuchi TB225 User Manual

Takeuchi TB225
297 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #147 background imageLoading...
Page #147 background image
3-17
OPERATION
Operating the arm
OPERATING THE MACHINE
Arm in:
Tilt the left operating lever backward.
Arm out:
Tilt the left operating lever forward.
Operating the bucket
Bucket load:
Tilt the right operating lever to the left.
Bucket dump:
Tilt the right operating lever to the right.
Boom swing left:
Step on the left side of the pedal.
Boom swing right:
Step on the right side of the pedal.
Operating the dozer blade
Operating the boom swing
Dozer blade lower:
Tilt the lever forward.
Dozer blade raise:
Tilt the lever backward.

Table of Contents

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Takeuchi TB225 and is the answer not in the manual?

Takeuchi TB225 Specifications

General IconGeneral
Engine MakeYanmar
Max Dig Depth2, 580 mm
Bucket Capacity0.03 - 0.11 m3
Max Reach7, 010 mm
Max Digging Depth3, 870 mm

Related product manuals