The bow pulpit, lifelines and stern rail may be purchased from the factory for
owner installation . Figs 13 and 13A show the position in which the stanchion
bases should be installed. All bases should be through bolted and all holes
caulked. Those bolts visible below decks should be finished with cap nuts. The
vinyl covered lifelines will require to be cut to length and crimped with a
nicropress swaging tool.
ANCHOR WELL HATCH
This covers the self draining anchor well in the foredeck. It serves to extend the
working deck area and also prevents debris from accumulating in the well and
blocking the drain. If this hatch is not already fitted to your Tanzer 22, it maybe
purchased separately for owner installation as follows
1. Place hatch in well and install the two teak turn-buttons with the screws
provided. These should be installed in the deck close to the outer edge of
the hatch. The larger teak stop, retained with two screws, should be
installed near the forward edge.
2. The stainless steel eye strap to secure the safety line should be thru bolted
to the port side of the well with the bolts provided
3. All holes should be caulked.