EasyManua.ls Logo

Taylor 345 - Priming and Brixing

Taylor 345
56 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
6-10
OPERATING PROCEDURES
Models 345, 346, 349, 355
Operating Procedures
6
Priming/Brixing
1. Connect the syrup line to the syrup tank (or the Bag-
in-Box).
2. Press the BEATER key to pressurize the freezing
cylinder.
Figure 6-39
After three minutes, press the PRIME key. This will
cause the product to flow to the mix hopper.
Figure 6-40
3. Raise the prime plug enough to allow a slight hissing
sound.
Figure 6-41
Note: The pressure in the freezing cylinder should
be relieved slowly.
4. Slowly open the syrup sampling valve and let it run
into a pail until all the sanitizer is removed and
full-strength product is flowing. Do not open the
valve so much that the syrup line to the hopper is
drained.
Figure 6-42
Brix is the ratio of syrup to water that will directly
affect the quality and taste of the product. Brixing
should be done before priming the freezer and when
a change in syrup flavor has been made.
13039b
13039p
11138
18032

Related product manuals