OPERATING PROCEDURES
6-3
Model C302
Operating Procedures
6
Note: The scraper blades on the beater assembly
should be in the 6 o’clock and 12 o'clock positions.
This will enable freezer door installation.
Figure 6-7
7. Before installing the draw valve, slide the two O-rings
into the grooves on the draw valve. Lubricate the
O-rings and the valve as illustrated below.
Figure 6-8
8. Insert the draw valve into the freezer door spout from
the front of the machine. The valve is properly
installed when the hole in the draw valve is visible in
the slot of the freezer door spout.
Figure 6-9
9. Snap the draw valve handle onto the door spout.
Align the hole in the draw valve with the slot in the
draw handle.
Figure 6-10
10. Slide the pivot pin through the draw handle and into
the draw valve. Place the draw handle slide over the
opening in the draw handle and the pivot pin. Secure
the assembly with the screw.
Figure 6-11