Feed Tube Assembly
1. Slide the three O-rings into the grooves of the inner
feed tube.
Figure 6-22
2. Slide the two O-rings into the grooves of the outer
feed tube.
Figure 6-23
3. Slide the small O-ring into the groove of the air
orifice.
Figure 6-24
Note: Make sure the hole in the air orifice is clean
and is not clogged. If the hole in the air orifice
becomes clogged, use soap and hot water to clear
the hole. Do not enlarge the hole in the air orifice.
4. Lay the inner feed tube, the outer feed tube, and the
agitator in the bottom of the mix hopper for sanitizing.
Figure 6-25
5. Repeat steps 1 through 4 for the other side of
Model C717.
Sanitizing
1. Prepare an approved 100 PPM sanitizing solution
(example, 2-1/2 gal. [9.5 L] of Kay- 5
®
or 2 gal. [7.6 L]
of Stera- Sheen
®
).
Note: Use warm water and follow the
manufacturer’s specifications.
2. Pour the sanitizing solution over all the parts in the
bottom of the mix hopper and allow it to flow into the
freezing cylinder.
Figure 6-26
Note: Since you sanitized the mix hopper and parts,
make sure your hands are clean and sanitized.