P2012
AIRCRAFT MAINTENANCE MANUAL
Revision Revised chapter /
page
Description of Revision
Reference
resistance’’
Revision Revised chapter /
page
Description of Revision
Reference
0
52-10/201 to 206 Added procedures ‘’Crew Doors
electrical Contacts’’ and related
figures
Under DOA
privileges
(DOA ref.
EASA21J.335)
52-10/212, 213 Updated procedures ‘’Electrical
Contacts Crew Doors Locking
System’’
52-10/243 Updated procedure ‘’Locking door
Pressure Switch’’ (Jobcard 1377)
52-20/201, 202 Updated procedure ‘’Emergency
exit’’
52-20/204 to 208 Added procedures ‘’Rh emergency
exit removal’’, ‘’Rh emergency exit
installation’’, ‘’Rh emergency exit
operational check’’
52-40/201 to 208 Added procedures ‘’Door
Operational Test’’, ‘’Door safety
lock system preliminary test’’,
‘’Door safety lock system
operational check’’ and related
figures
53-00/1 and 5 Added point E in ‘’Description’’
chapter and added figure (Mod
2012/176)
53-00/202 to 204 Added procedures ‘’Front Radome
Removal/Installation’’ and ‘’Front
Radome Resealing’’ (Jobcard
1327)
53-00/216 to 218 Added procedure ‘’LH and RH
Stabilizer Fairings Replacement’’
and related figureS (Mod 2012/176)
55-10/214 to 221 Updated procedure ‘’Carry through
Removal/Installation’’ and related
figures
55-20/201 to 207 Updated procedure ‘’Elevator
Removal/Installation’’ and related
figures
55-20/209 to 211 Updated procedure ‘’Elevator Trim
Tab Removal/Installation’’ and
related figure
55-20/218 to 220 Updated procedure ‘’Pitch trim
actuator free play servicing
RECORD OF REVISIONS
Page 8
5
th
Edition - Rev. 0