P2012
AIRCRAFT MAINTENANCE MANUAL
Revision Revised chapter /
page
Description of Revision
Reference
0
21-40/206 Added procedure ‘’Windshield FAN
and Heater Test Procedure’’
Under DOA
privileges
(DOA ref.
EASA21J.335)
21-40/207 Added procedure ‘’Pilot Cabin Floor
FAN and Heater Procedure’’
23-30/2 to 5 Added description ‘’ Audio
Integrating’’ and related figures (Mod
2012/181 or TR-AMM-212-008)
23-30/102 Updated Table Fault Isolation: added
point 5 (Mod 2012/181 or TR-
AMM-212-008)
23-60/205 to 207 Added procedures ‘’Static Discharger
Bonding Inspection’’(inspect prior to
flight, periodic inspection and heavy
inspection)
24-00/202 to 206 Added procedure and figures
‘’Preflight test switches
replacement’’
24-00/207 to 214 Added procedure ‘’Toggle switch (with
terminals screws) replacement’’ and
related figures
24-30/225, 226 Updated procedure ‘’Voltage
Regulators Adjustment’’
24-30/227 Updated figure ‘’Voltage Regulator
Replacement’’
24-30/228 Added figure ‘’Voltage Regulator
Replacement’’
24-30/229 Added procedure ‘’Converter#1
replacement’’
24-30/230, 231 Updated procedure ‘’Converter
(28V/14V) check’’(this procedure has
been moved from ATA 33-10) and
related figure
24-60/10 Updated Table Switches
25-10/212, 213 Added procedure ‘’Rear Tubolar Assy
Replacement’’ and related figure
(Jobcard 1420)
25-60/205 Added procedure ‘’ELT Inspection’’
26-10/201 Updated procedure ‘’Fire Detector
Replacement’’
26-30/203 to 210 Added procedures ‘’Engine Central
Firewalls Removal/Installation’’ and
related figures
26-30/211 to 215 Added procedures ‘’Outboard
Firewalls Removal/Installation’’ and
related figures
26-30/216 to 218 Added procedures ‘’Inboard Firewalls
Removal/Installation’’ and related
figures
RECORD OF REVISIONS
Page 3
5
th
Edition - Rev. 0